HAS-200 Modules 1-3 individually functioning
This is showing each module run through once successfully.
(Module 1)
(Module 2)
(Module 3)
(Module 4)
Friday, May 9, 2014
Week Six
Today was spent dialing in module 1-3 and trying to get module 4 running, after a few sporatic runs and an attempt at restarting the PLC, we determined new batteries are needed, but the module 4 should run fin once the program is functioning.
(Capper working several time successfully)
(A Run Through of the Module 1-3)
Friday, May 2, 2014
Week Five
The continuous air lines were ran to the HAS-200 assembly line and blog was updated to date.
- Regulator for the continuous air system needs to be replaced.
- Regulator for the continuous air system needs to be replaced.
Monday, April 28, 2014
Friday, April 25, 2014
Friday, April 18, 2014
Week Three
Continued investigation of the HAS-200 and began calibration of the modules.
(Josh is gonna Love this)
(Video 1)
(Video 2)
(Video 3)
Friday, April 11, 2014
Week Two
Reviewed machine processes and developed a plan to make the HAS-200 fully operational.
(The crew is busy working)
(Investigating Machine Processes)
Friday, April 4, 2014
Week One
Setup HAS-200 assembly line and get acquainted with the module configuration.
- Tied together and leveled the modules
- Removed module 3's motor and replaced the belt and modified the drive pulley to prevent belt slip
(Module guide rails installed and aligned)
(HAS-200 Assembled)